Back to work on the layout

Summer is over and I have started back to work on the layout, I hope to push and get the lower level layout operational before Christmas. The first thing to do is finish the track wiring, at this point the double track is in place and the blocks are set, next I will finish the sidings. The whole layout is controlled from two positions one a tethered walk-around for the lower level and one for the upper level, in the picture the track on the right is the only common section for the two systems. Back at work on the layout

Leave a Reply

Your email address will not be published. Required fields are marked *

1 + 19 =